Repair work starts at Sandbanks coast after delays at Whitecliff

Repair work started at Sandbanks coast after delays at Whitecliff.

Work starts today to repair storm damage to the rock Groynes at Sandbanks.

The work, which was scheduled to begin yesterday, was delayed due to continuing operations at Whitecliff.

Rock was being added to the coastline to help protect it from being washed into the sea.

 

Storm aftermath coverage on The Breaker:  Beach clean-up in Boscombe, more flood support for Poole and dead birds washed up on Chesil beach.

Total
0
Shares
Leave a Reply
Related Posts

Businesses concerned about wind farm

Businesses along Bournemouth’s iconic seafront have expressed concern at plans to build an off-shore wind farm at Poole Bay. Eneco plan to build around 150-240 wind turbines, several times taller than Old Harrys Rock, which will be visible from Bournemouth beach.
Read More